more
Type



25 50 75 100
  • #1723354505 Hands reaching toward a book titled 'DIGNITY' with a minimalist design and symbolic emblem
  • #1940224957 Lit candle and wooden cross on table, symbolic religious scene
  • #1750247533 Puzzle Pieces Forming a Human Head Silhouette Representing Creative Thinking and Problem Solving
  • #1924740674 Hands Holding Stone in Ornate Setting.
  • #1923798607 Construction project timeline presenting a complete overview of a building lifecycle. A symbolic scene with phased building icons aligned
  • #1923809403 Ascension Day spiritual concept. Abstract clouds, light beams, and upward motion lines forming a serene symbolic composition without explicit figures. Quiet,
  • #1727836740 Captivating heart geometric symbolic Valentines wallpaper abstract Day modern shapes, design minimalist romantic offering
  • #1946773449 symbolic pencil with tree growing from wood texture represents education
  • #1900641691 Miniature house model under umbrella on office desk near laptop
  • #1909568895 Guiding Star: A symbolic compass rose, its intricate design, representing direction, navigation, and exploration, stands as a guide for journeys.
  • #1952743813 Monochrome close-up of hands from different cultures holding symbolic objects, intersected by a large blue semicircle and abstract rectangular blocks
  • #1955204752 map of Ukraine and Russia, simplified symbolic shape with russian and ukrainian flag colors
  • #1943572077 A symbolic visualization representing collaboration between human intelligence and artificial intelligence in modern business environments.
  • #1915438106 A symbolic representation of justice, embodied by a digital hammer on a technological surface, will serve as the primary background for legal websites or presentations on blockchain.
  • #1927597756 Surreal Shadow Motifs Grid. Surreal symbolic shadow motifs. Line outline icon set of Surreal symbolic shadow
  • #1873580012 Conceptual Illustration of Mind Transformation with Flock of Bird Metaphor Artwork
  • #1940401892 Cracked dry earth with smoke rising, dark dramatic sky, environmental devastation concept, symbolic war impact landscape
  • #1935076928 Beautifully crafted stained glass windows featuring religious and symbolic imagery like a white dove, praying hands, and a rose.
  • #1818916547 Textile Patterns A flat lay of a traditional hand-embroidered blouse huipil from Chiapas showcasing its intricate and symbolic patterns cultural detail in Mexico
  • #1923740898 Literary journey symbolic scene with a compass emerging from an open book, representing guidance, imagination, and meaningful knowledge
  • #1932205410 Two chickens shake hands in a symbolic gesture of agreement and friendship.
  • #1907221692 A minimalist line drawing depicts a woman with a raised fist symbolizing strength and defiance presented as a striking silhouette high quality professional
  • #1918404804 Illustration de la Tour Eiffel à Paris, symbole emblématique de la France et de l'Europe, avec des éléments urbains.
  • #1952479413 Detailed crown of thorns on a natural beige linen cloth with a deep symbolic shadow
  • #1932305524 Church engulfed in flames Symbolic representation of religious conflict or persecution. Dramatic visual metaphor for faith under attack. Vintage effect
  • #1946589006 Three matzah crackers on transparent background
  • #1727836826 Captivating shapes, geometric heart Day modern symbolic abstract design romantic Valentines offering minimalist wallpaper
  • #1649788734 A vibrant green sprout thrives inside a glowing light bulb nestled in a lush, sun-dappled forest, symbolizing innovative sustainable energy and ecological hope for a brighter future
  • #1939876491 Collection of directional and symbolic arrows on a white background
  • #1939421709 American and Iranian flags on chess pieces on a chessboard in a symbolic game
  • #1902592523 Passover evening calm. People preparing the seder table together, placing symbolic foods and setting cups. The atmosphere feels peaceful,
  • #1932962166 Ancient Egyptian script and symbolic art
  • #1936875027 Mother and child silhouette moment. A simple, symbolic scene of a mother and child facing each other with gentle gestures. Abstract shapes around
  • #1947527126 Twin eagles soaring wings outstretched symbolic illustration Vector
  • #1940606164 A collection of various mathematical and symbolic icons
  • #1855938518 Two illustrations with symbolic meaning: fragile this side up
  • #1940405446 Cracked dry earth with smoke rising, dark dramatic sky, environmental devastation concept, symbolic war impact landscape
  • #1946824647 blank soldier dog tags hanging from a soldier's rifle stuck in the ground, dramatic sky, symbolic memorial composition
  • #1940632385 Set of twenty-five religious and symbolic icons for Easter.
  • #1952976549 Tax review workflow highlighting verification and peace of mind. A clear symbolic scene where a tax form is checked and validated through simple visual cues.
  • #1703716888 A symbolic journey through emotion and reason, tracing the balance between living and achieving.
  • #1946241875 Justice scale fulcrum macro featuring worn metal pivot, balanced tension detail, shallow depth focus, symbolic equilibrium, fairness concept, and refined craftsmanship in classic legal symbolism
  • #1918404777 Tour Eiffel emblématique de Paris, France, dans un style dessin animé vintage avec un ciel nuageux.
  • #1795614399 A woman's face is obscured by a bright screen, symbolizing a digital influence. ..Created with Generative AI, not depicting real subjects.
  • #1940970853 A symbolic representation of conflict between Israel and Iran with a rocket launch
  • #1876716078 red heartbeat line forming a heart shape, representing life, love, passion, and emotional connection ideal for medical romance concepts, valentines designs, and symbolic modern graphics
  • #1971769088 A symbolic door opening to a bright landscape filled with peace doves and sun
  • #1936783343 Israel vs Iran conflict, city skyline with missiles and flags, war and tension concept
  • #1952195416 40.Assortment of Japanese bonsai plants in ceramic pots, symbolic shapes representing zen and prosperity, stylized vector illustration with clean outlines
  • #1941345740 Heartwarming happy mothers day photos with symbolic lighting effects
25 50 75 100

More info

Con las fotos en cartón pluma o FOAM estarás imitando la forma de imprimir fotos en cartón pluma de los fotógrafos profesionales. Y es que la calidad de la impresión es mayor a la impresión directa. 

Hay que tener en cuenta que los cuadros de cartón pluma no retienen el enfoque y colores como el papel fotográfico.

Otra de las características de las fotos en cartón pluma es que cuenta con microlaminas imperceptibles a la vista que hace que el producto no se curve.

Cómo personalizar tus cuadros de cartón pluma

Sube tu foto

Para conseguir tu marco de fotos cartón pluma o FOAM, elige una foto de tu ordenador o selecciona alguna de las imágenes de nuestro banco.

Selecciona el tamaño

Escoge el ancho y el alto (en centímetros), de tu cuadro cartón pluma. El mínimo son 50cm y, el máximo, 3000cm.

Las fotos en cartón pluma y precio empezarán desde 13€. En función del tamaño variará.

Características del material

Puedes elegir entre cartón pluma para fotos de 5mm de espesor, o 10mm de espesor.

¿Qué forma te gusta?

Son varias las formas disponibles, además de la normal: 

Doble.

Triple.

Cuádruple.

¿Quieres algún efecto?

Por lo que respecta a los efectos, son varias las opciones con las fotos en cartón pluma o FOAM:

Sin efecto.

Blanco y negro.

Sepia.

Frío.

Flip horizontal.

Flip vertical.

Rotar.

Ventajas de las fotos de cartón pluma o FOAM

Ligereza y dureza del material.

Calidad con alta definición.

Diseño a medida. 

Versatilidad.

Durabilidad.

¿Cómo colgar los cuadros de cartón pluma?

Colgar los cuadros de cartón pluma te resultará realmente sencillos. Las fotos FOAM cuenta con un colgador que te permitirá colocarlas en cualquier espacio.

¡Consigue tus fotos en cartón pluma online en Rotulatumismo!

Para mas tipos de cuadros Aquí

Info